Corporate Milestones
- 2016 - The factory in Pasir Gudang Industrial Zone, Johor Bharu, Malaysia, was put into operation and production capable 0f 960,000 inches .
- Undertook the Petronas (RAPID Project) and completed nearly 500,000 inches of CS, SS, AL, high-grade pipeline prefabrication.
- 2019 - OTEC VOPAK IMO Singapore project over 70,000 inches CS pipeline modular prefabrication.
- PEC pipe support prefabrication.
- DYBACIATE tank prefabrication.
- 2020 - CPECC pipe gallery steel structure prefabrication of 3,000 tons; HQC ATB project CS, SS pipe prefabrication of nearly 100,000 inches.
- 2021 - DIALOG Titanium NBL project pipe gallery general contract nearly 2,000 tons; DHI Titanium NBL project CS, SS pipeline nearly 100,000 inches.
- 2022 - DIALOG Nutmeg project piping, structure, storage tank, turnkey: DIALOG Star project structure turnkey.
- MIE Intel project 240,000-inch CS, SS pipeline prefabrication: CRCG, CGPV, AP, HBN, and other non-oil and gas structures.
- 2023 - CCECC first pioneer project of industrial steel structure ( package 2 ) Alton Mega Factory Project.
- MDSB Donghwa Electrolyte USA.
- WK Asia RCRTO skid Fabrication.
- GDS Malaysia Data Center.
- 2024 - 2026 - Small EPCC